澳门新莆京网站
Your present location:Home >> Surface Treatment


 

澳门新莆京网站
  

   Investment: $4.76 million

   Production area: 86,000 ft2

   Capability: Surface treatment (NDT, coating and painting) of Aluminum and Hard metal parts

 

  

   Our chief engineer have more than 40 years experiences on aerospace surface treatment, familiar with OEMs’ specification.

    The manager have rich experience on surface treatment company operating, fully guarantee the cost saving to customer.

 

 

 

 

Plan

Scope

Production Line

Size

Capability Description

Settle Date

Stage 1

Alu. Alloy

Anodizing Lines

1.5m*1.5m
4m*1.5m

Anodizing (Chromic Acid , Sulfuric Acid, Boric-Sulfuric acid, Tartaric Acid )
 Anodine 1500/1200s  

2016/8/15

 

 

Painting Lines 

4m*1.5m

Primer
 Topcoat
Dry film lubricant

 

 

 

NDT Lines

4m*1.5m

Fluorescent Penetrant Inspection

 

Stage 2

Hard metal

Plating &
Passivation

3m*1.5m

Plating(Cadmium, Nickel, Chrome, etc.)
 Passivation
Titanium pickling

2016/12/30

Stage 3

Chemical milling

 

4m*1.5m

Skin and panel chem-milling

2017/6/30

 
www.27111.com

正在缅甸小勐拉新葡京

澳门新莆京网站